Select a topic from the dropdown below or use the search box to refine your results.
Through a Preliminary Design Effort (PDE), Westinghouse collaborates with the Utility and, as appropriate, the Architectural Engineering (AE) firm to develop the documentation needed for the 30% design milestones. This early collaboration forms alignment between the involved parties, reduces project risk and supports smoother project execution.